Tag: sabbatical

  • Sabbatical–First Reflections

    My company, Red Gate software, has given me a 6 week sabbatical. I’m documenting the time with all the posts under a tag if you want to follow along.

    I’m back in the UK as I write this, having flown over on the last day of my sabbatical. Things were slightly cut short, but I can’t complain at all after having six weeks off.

    I wanted to reflect a bit on the sabbatical right away, and then again later. I’ve set reminders in my calendar for the end of the year as well as next spring to think about what this time meant for me.

    I’ve broken this down in to a practical section that looks at the plan and how things went and then a more reflective section that examines the value and meaning of the sabbatical.

    Learning and Growing

    When I planned this sabbatical, I didn’t have any burning desire to accomplish a single thing. That’s not quite true as I’ve wanted to work on a book, but since I write for a large part of my job, I decided not to make that a sabbatical project. Instead I decided to tackle three things:

    • Take a woodworking class
    • Volunteer for Habitat for Humanity
    • Build a Flagpole

    Going into the sabbatical, I wasn’t sure what to expect. I thought I could volunteer three times a week, take a class a couple nights a week, and quickly build my project. It turns out, like most software estimates, I was wildly optimistic about the time and effort things would require. I also hadn’t accounted for the setbacks that invariably occur.

    Woodworking Fundamentals

    I signed up for a class at a local community college, which happens to host one of the premier woodworking programs in the US. While I have built various projects out of wood for years at home, I’ve never had any formal training on how to use tools and work with wood. I’m completely self-taught, and as I quickly found out, I had no idea what I didn’t know.

    The class was initially a bit of a disappointment as it dealt primarily with hand tools. I had hoped to gain some skill with machines, as I have a number at home. However I quickly found that tasks like flattening a board, and hand chopping mortises weren’t as daunting as they seemed and I picked up a few skills I might never have learned otherwise. I also learned to appreciate craftsmanship and working slowly, marking nad measuring in a new way.

    The class turned out to be a little lecture and lots of lab practice, trying to build skills. It certainly has made me appreciate the speed of skills, but also mourn the crude ways in which they work. Hand tools are much better for many tasks, though they can be slow. I’m only a little over halfway through class, with it continuing through the end of the month. The next couple weeks when I get back will have my busy at night, trying to finalize my project. I’ll continue blogging about that project under the same tag, in case anyone is interested.

    Habitat for Humanity

    I’ve told the story before, but a few years ago I was at dinner with a few couples and someone asked everyone what they’d do if they won the lottery and didn’t have to work. There were a variety of answers, but I struggled with the question. I enjoy working and enjoy my job, but when pressed, the thing that came to mind was working for Habitat to help the world.

    I’ve always admired their mission, and I think helping people find a good, stable, shelter for their lives is important. With that in mind, I decided to volunteer for the Denver affiliate for Habitat. I attended an orientation, and then browsed the volunteer opportunities. In my six weeks, I volunteered 9 times, working at the ReStores, building new houses, fixing old ones, and deconstructing a kitchen for a renovation (and the cabinet donations).

    It was a great experience, and I enjoyed the chance to work with a variety of Habitat employees, Americorps volunteers, and many local people that were volunteering their time. I learned a few skills an d tricks, and while I’m not sure I made a big difference, I know I made some small ones.

    I also had the chance to do some good, hard, physical work outdoors. That’s something I’ve done relatively little of in the last decade, and I learned that it’s hard. I was quite worn out some of those days, and I’m not sure I could have volunteered three times a week with my other projects.

    Flagpole

    The one project I set for myself was building a flagpole out of wood. I’d seen this done on The New Yankee Workshop, and I planned to challenge myself to follow the plan and build the pole. With a DVD and measured drawing, I set out to construct a flagpole.

    When I watched the DVD and thought about it, it seemed as though I should be able to build the pole in 2-3 weeks. However I didn’t count on the delays and obstacles that come into play. Weather was a big one for me, with more rain, on more afternoons, that I can remember in recent years. Those delays cut short my work on quite a few days.

    In the end, I managed to complete the pole and get it painted, though there’s more work to do. I ordered hardware for the pole and still need to construct a base to hold it upright, both things I expect to handle in the next 3-4 weeks as well. The future plans have a flag flying by Labor Day.

    Was It Worth the Time Off?

    This is a question that Andy Warren posed to me a few weeks ago. My wife also asked me last week, “Was it great?”

    Those are tough for me to answer. On one hand, it was a busy time, with lots of things happening each week. It felt somewhat surreal, as though I’d moved on to a new phase of my life. I slipped right into going to school, getting up early or construction commitments, and working on a large project around the house.

    On the other hand, it was very relaxing in that I didn’t have great pressures on me. While I’d committed to Habitat projects, I moved a few around, and I knew I could cancel things as needed. I also paced myself with the flagpole, moving slower than necessary to avoid rework where possible.

    I was proud of myself that I managed to avoid email and work. I didn’t check of log onto SQLServerCentral during the time, except the weekend I flew to SQL Saturday #286 – Louisville. Even then I didn’t process or clear much email and as I return to work today, I’ve got nearly 1,000 emails to clear out from the six weeks. I did continue to check Twitter a bit, though I tried to avoid reading technical pieces that were linked and avoided work discussions.

    I did miss work a bit, and I’m certainly ready to come back. I slipped back into my job, checking a things on Sunday (while waiting for paint to dry) and getting ready to fly to Red Gate and SQL Bits this week.

    However I do feel refreshed. I’m relaxed and unworried about SQLServerCentral, which was not always the case in the past when I’ve taken vacations. I also know some of my worldview has changed. I appreciate my job, the success I’ve had, and I do think that I’ve matured a little in terms of how I see the world.

    Will this make me a better DBA/Developer/Editor/Writer? It’s hard to tell, but I’m certainly ready to dive in and grow my skills, working to educate people about SQL Server, as well as evangelize Red Gate’s products and ideals. I’m also grateful that I had the time off, and I appreciate more and more that Red Gate is a fantastic company.

    All in all, it was a good six weeks of growth and change for me. I’m not dying for another six weeks off again, and I’m not sure what I’ll spend my next sabbatical doing, but I am sure that I’ll take one again in another five years if I have the chance.

     

    I learned more about Habitat, and admire them more than before. They don’t give away houses; they sell them at cost, setting payments and carrying mortgages that enable homeowners to succeed in their lives.

    I’ve also contacted their speakers bureau, thinking that my skill as a public speaker might help Habitat Denver continue to grow in the future.

  • Sabbatical Day 34 – The End

    My company, Red Gate software, has given me a 6 week sabbatical. I’m documenting the time with all the posts under a tag if you want to follow along.

    Today is the last day of my sabbatical, and a cut short one at that. I leave at 11 for the airport to fly to the UK for business overnight. Not quite what I expected, especially with a trip in the middle over a weekend for work, but it is what it is and I’m OK with that.

    Today is actually no woodworking or volunteering. I was up early packing things, trying to find my computer/work stuff and get it in a bag, then dropping my daughter off at a volleyball camp, handling some bank paperwork that had to be notarized, and then heading to the airport.

    It’s amazing to think it’s been six weeks. I made it a little over halfway through a woodworking class (more coming next two weeks), volunteered and learned a lot about Habitat, and built a flagpole from scratch.

    I’ll review the six weeks on the flight, but it’s been a fun ride.

  • Sabbatical – Day 33 – Paint

    My company, Red Gate software, has given me a 6 week sabbatical. I’m documenting the time with all the posts under a tag if you want to follow along.

    This is it for the sabbatical. Technically I have tomorrow, but I fly to the UK and have a few errands to run in the am, so I won’t get a chance to do anything else.

    However I did "finish" the pole today in a sense. It has a first coat of paint on it, and technically it could be raised if I had a base.

    The day started with more primer. My daughter helped me get another coat on the pole after I filled a few holes and sanded the entire thing down with 220 grit sandpaper. We primed it all over and then headed to the store.

    Photo Jul 13, 2 23 45 PM

    When we got back, I put a coat on 2/3 of the pole before heading off to work on other chores. I had a lot I wanted to get done, and I forgot a few supplies, but I kept busy for an hour before flipping the pole and putting a first coat on the rest of the pole.

    That was it. I had to just cover up the pole and tie it down for a week. I head to the UK tomorrow for a week, so I won’t be able to sand and paint it again until next weekend. Then I’m hoping to go visit a friend and see about getting the base built from metal.

  • Sabbatical Day 32 – Catchup with Paint

    My company, Red Gate software, has given me a 6 week sabbatical. I’m documenting the time with all the posts under a tag if you want to follow along.

    I’m almost out of time and I leave Monday for the UK. So it’s another Saturday catch-up day.

    I started the day with a trip to the store. I had to go out anyway, so I grabbed a few more sanding belts and got back to work on things.

    Photo Jul 12, 1 59 17 PM

    Using some new 36 grit sandpaper, I first hit a few rough spots where one of the 3 boards making up a side was taller than others. This went quickly, giving me a relatively smooth surface.

    Then I switched to 80 grit and went up and back, flipping the pole after each passage until all 4 sides were done at that level.

    Photo Jul 12, 2 00 29 PM

    I next went to 120 grit, which is good surface prep. It’s slow going and messy, as I cut lots of wood dust from the tops, along with some epoxy, but as I worked each side, it was becoming more and more of a pole.

    Photo Jul 12, 2 01 10 PM

    The first two grits also helped me round the top more, breaking and easing the edges on all sides, even where the router didn’t cut deep. At the end, I had a heck of a pole.

     

    Priming

    I wanted to get moving, so I decided to prime the pole. However I first needed to fill in a few spots, which I did with wood filler.

    Photo Jul 12, 2 24 23 PM

    Then I started with the first coat of primer. I’m actually thinking to do a couple here, and the plan I had was to do the top and one side, then go back and do the other side and the top again.

    Photo Jul 12, 3 18 51 PM

    I completed one coat, the flipped it over and did the same thing on the other side. This was all "four" sides get two coats.

    Photo Jul 12, 3 34 34 PM

    The last coat wasn’t completely dry when weather came in and I had to hurriedly cover things as the rain started to fall.

    I need to order my truck now that I know the top size (2 1/2") and then also get more paint. Hopefully I can paint things tomorrow sometime and then start working on the base.